Project Update - October / November 2017

UMRR Roadway Improvements - Final Activities:

MANATEE COUNTY, FL (Oct. 25, 2017) – Contractors will be performing the final lift of asphalt on Upper Manatee River Road, extending from SR 64 to the Fort Hamer Bridge. Work is set to begin on Sunday, October 29, 2017, and continue through Saturday, November 4, 2017, with activities taking place between the hours of 7 p.m. and 7 a.m. Work will begin at the south end of the bridge and finish up at 10th Street.


  • While working in the river, a marine vessel is used to assist with construction of the bridge.
  • The northern approach is being constructed and will connect with end bent 19 at this location.
  • The crane is positioned on top of the trestle (temporary bridge) as crews prepare for construction of the next pier on the river’s edge.
  • Looking south at the bridge from ground-level.
  • The sidewalk is poured alongside of the deck and forms are set for the placement of barrier wall.
  • Construction of pier 15 is underway.
  • Looking South - 800 feet from the north bank of the Manatee River
  • Looking south towards UMRR - Future southern approach to the bridge
  • 134 foot girders (beams) on top of Piers 12 and 13
  • Installation of guardrail on the northern approach to bridge
  • Looking north from Winding Stream Way towards the bridge
  • Looking North at Pier 8
  • Aerial View of the Beams Prior to the Deck Pour
  • Looking North Toward Fort Hamer Park
  • The Bridge Deck Looking South Toward Upper Manatee River Road
  • Looking South Toward the Construction of the Southern Approach to Bridge
  • Fort Hamer Bridge Approximately 1500 Feet from the Northern Bank of the Manatee River
  • Looking North at the New Signalized Intersection at UMRR and Fort Hamer Road
  • Construction of Sidewalk, Curb and Gutter along UMRR
  • Span 7 Extending out to Pier 6
  • Looking South Toward Pier 2 from the Temporary Bridge
  • Southern Approach to Fort Hamer Bridge
  • Trestle Bridge Relocated to the Southern Bank of the Manatee River
  • Concrete beams connect the north end of the bridge with the deck on the south end.
  • Aerial view of Fort Hamer Bridge that stretches the entire width of the Manatee River.
  • All the piers are constructed and all the beams are set allowing crews to finish the barrier wall and pedestrian railing.
  • Construction Assist Marine Vessel
  • Northern Approach Construction
  • Crane on a Trestle
  • Beams
  • Sidewalk01
  • View of Pier 15
  • South Facing - Besides Manatee River
  • South Facing - Future Road to Southern Approach
  • Girders to Pier 12/13
  • Guardrail Installation
  • Looking Towards Bridge Construction
  • 20161130 FHR Looking N
  • 20161130 FHR Bridge Deck
  • 20161130 FHR Bridge Looking N
  • THE BRIDGE DECK LOOKING SOUTH TOWARD UPPER MANATEE RIVER ROAD
  • Ft. Hamer bridge6 2
  • Ft. Hamer bridge2 2
  • Intersection at UMRR
  • Sidewalk, Curb and Gutter along UMRR
  • Under Bridge
  • Looking at Pier 2
  • southern approach resized
  • Trestle
  • Concrete Beams
  • Aerial view of Fort Hamer Bridge
  • Piers and beams are set

Subscribe

FHB Distribution List

Your Email(*)
Please let us know your email address.

First Name(*)
Please let us know your name.

Last Name(*)
Please let us know your name.

(*)
Invalid Input

Verify humanity(*)
Verify humanity
Invalid Input